Papilio Pro

From LinkSprite Playgound
Revision as of 03:34, 5 January 2013 by Jingfeng (talk | contribs) (Test Plan of Papilio Pro)
Jump to: navigation, search

Test Plan of Papilio Pro

Testing Prerequisites (What you need)

  • Terminal Application - Hyperterminal is used in this guide but any terminal program can be used. In our case, we use X-CTU.
  • Stimulus Board: We use a Papilio One 250K with Male headers soldered on facing downwards.

Testing Procedure

Prepare the stimulus board

  • If this is the first time a Papilio board is being used on your computer then install the Papilio Loader and Drivers.
  • Download the latest version of the Gadget Factory Test Plan package.
  • Prepare the stimulus board with the stimulus bit file.
    • Navigate to the directory where the Gadget Factory Test Plan is unzipped to and enter the "Papilio_Pro_Verification" folder.
    • Connect the Stimulus board to the USB port.
    • Run "Prepare_Stimulus_Board.bat" file. You can run this file by double clicking it.
    • Verify the results:

File:Http://www.gadgetfactory.net/opmanuals/uploads/Main/P1 3.png